Shuweihat Water Transmission Scheme

Water transmission pipeline, Twin DN1600 pipeline of 250 km with pumping stations at Shuweihat, Mirfa and Mussafah; transfer capacity raised from 100 MGD to 180 MGD under Phase 2 in United Arab Emirates.

Operational

The record

Country
United Arab Emirates
Location
Shuweihat to Mussafah, Abu Dhabi
Coordinates
24.166, 52.568
Technology
Water transmission pipeline
Capacity
Twin DN1600 pipeline of 250 km with pumping stations at Shuweihat, Mirfa and Mussafah; transfer capacity raised from 100 MGD to 180 MGD under Phase 2
Capital cost
—
Stage
Operational
Owner or client
TRANSCO (Abu Dhabi Transmission and Despatch Company)
Contractor
ABB (Phase 2 extension of the Shuweihat and Mirfa pumping stations, electrical, mechanical and civil works)
Operator
TRANSCO
Finance
Government of Abu Dhabi
Award or start year
2009
Commissioned
2011-11

Record last checked 2026-09-18.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. ABB, Project Report: Shuweihat Water Transmission Scheme Phase 2, Abu Dhabi. library.e.abb.com.
  2. The system comprises Shuweihat, Mirfa and Mussafah pumping stations plus a parallel double pipeline of 1600 mm diameter and 250 km length with a transfer capacity of 100 million gallons a day; Phase 2 raises capacity to 180 million gallons a day to carry output from Shuweihat Phase 2; awarded to ABB in October 2009 with completion scheduled for November 2011; end user TRANSCO; four pump units of 5,700 m3/h at Shuweihat and four of 5,400 m3/h at Mirfa.
  3. TRANSCO, 2019 Seven Year Water Planning Statement (2020-2026). saudigulfprojects.com.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Describes the Shuweihat to Mirfa intermediate pumping station line as one of the network's high pressurised systems.