Dubai Strategic Sewerage Tunnels (DSST)

Wastewater conveyance tunnel, About 75 km of deep tunnels (Bur Dubai and Jebel Ali about 50 km, Deira about 25 km) with 140 km of link sewers and two terminal pumping stations, up to 90 m deep in United Arab Emirates.

In tender

The record

Country
United Arab Emirates
Location
Dubai
Coordinates
—
Technology
Wastewater conveyance tunnel
Capacity
About 75 km of deep tunnels (Bur Dubai and Jebel Ali about 50 km, Deira about 25 km) with 140 km of link sewers and two terminal pumping stations, up to 90 m deep
Capital cost
US$8 billion
Stage
In tender
Owner or client
Dubai Municipality
Contractor
—
Operator
—
Finance
Public-private partnership, design-build-finance-operate-maintain with concessions of 25 to 35 years; estimated initial capital expenditure AED 30 billion (about US$8 billion) and lifecycle cost AED 80 billion
Award or start year
2025
Commissioned
—

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. AGBI, Dubai takes step forward on $22bn sewage tunnel network (10 April 2025). agbi.com.
  2. Dubai Municipality issued requests for proposals for the first two contracts; estimated initial capital expenditure AED 30 billion (US$8 billion) and total lifecycle cost AED 80 billion per Tribe Advisory; two main tunnels totalling 75 km with 140 km of supporting tunnels up to 90 m deep, six packages tendered as PPPs with 25 to 35 year concessions.
  3. Engineering News-Record, Dubai Selects Teams for Key Contracts of $22B Sewer Tunnel Megaproject (1 July 2026). enr.com.
  4. In early June 2026 Dubai selected a consortium of Etihad Water & Electricity with Tamasuk Holding and Alkhorayef Water & Power to bid for Package W (about US$3 billion) and a group led by Vision Invest with Suez to bid for Package J (about US$2 billion); the Links package covering more than 200 km of tunnels remains in tender; packages were reconfigured and retendered in November 2025; more than 150 legacy pumping stations are to be decommissioned.
  5. Parsons, Dubai Strategic Sewerage Tunnels. parsons.com.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Parsons was appointed by Dubai Municipality in 2016 for design and programme and construction management; project value stated as 3.2 billion.