Zahle Wastewater Treatment Plant

Wastewater treatment + reuse, Treats around 20,000 m3/day in Lebanon.

Operational

The record

Country
Lebanon
Location
Zahle
Coordinates
33.794, 35.914
Technology
Wastewater treatment + reuse
Capacity
Treats around 20,000 m3/day
Capital cost
—
Stage
Operational
Owner or client
Council for Development and Reconstruction
Contractor
SUEZ Environment (build-operate-transfer)
Operator
UNDP-contracted operator since September 2022
Finance
Italian Agency for Development Cooperation loan of EUR 22 million with EUR 7 million from the Government of Lebanon; operation funded from 2022 by an Italian grant of EUR 4 million channelled through UNDP
Award or start year
2022
Commissioned
2017-10

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Karim Eid-Sabbagh, Wastewater Reuse in Lebanon: Shedding Light on Hydro-Social Politics at Multiple Scales, Water Alternatives 16(2): 606-631 (2023). water-alternatives.org.
  2. The plant treats around 20,000 m3/day of high-quality water lost to the polluted Litani; it was financed with a EUR 22 million loan from the Italian Agency for Development Cooperation plus EUR 7 million from the Lebanese government; the CDR implemented the funds through a BOT contract awarded to SUEZ Environment with operation fees of EUR 2 million a year, supervised by the consulting company Rafiq Khoury; in 2020 the Bekaa Water Establishment stated it could not operate the built and equipped Iaat, Joub Jannine and Zahle plants to required standards.
  3. The961, Italy signed a $4.2 million loan for the wastewater treatment plant in Zahle (27 Jun 2022). the961.com.
  4. EUR 4 million from Italy over two years, managed by UNDP, covering sludge treatment.
  5. World Bank, Aide-Memoire, Implementation Support Mission 5-16 May 2025 for the Lake Qaraoun Pollution Prevention Project. documents1.worldbank.org.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The remaining 38 km of sewer network in Zahle was due for completion by November 2025, a solar sludge dryer design by November 2025, and handover of all sewer network to the Bekaa Water Establishment by December 2025. Budget left blank: the euro figures carry no conversion rate or date. Coordinates from OpenStreetMap.