Bourj Hammoud Wastewater Treatment Plant
Wastewater treatment, About 900,000 population equivalent; no design flow published in Lebanon.
Planned
The record
- Country
- Lebanon
- Location
- Bourj Hammoud
- Coordinates
- —
- Technology
- Wastewater treatment
- Capacity
- About 900,000 population equivalent; no design flow published
- Capital cost
- —
- Stage
- Planned
- Owner or client
- Council for Development and Reconstruction
- Contractor
- —
- Operator
- —
- Finance
- European Investment Bank loan of EUR 60 million within a EUR 155 million project; later feasibility work funded by the EBRD
- Award or start year
- 2005
- Commissioned
- —
Record last checked 2026-09-18.
History
- 2005-12
European Investment Bank loan of EUR 60 million signed on 28 December
- 2020-11
Feasibility study and environmental and social scoping published by the Ministry of Energy and Water
Sources
4 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- European Investment Bank, Greater Beirut Wastewater (project 19982326). eib.org.
- Promoter the Council for Development and Reconstruction; EIB finance EUR 60 million against a total cost of EUR 155 million; signed 28 December 2005; the project covers construction of a wastewater treatment plant and preliminary treatment at Dora, rehabilitation or reconstruction of the existing sea outfall and related collectors and networks, for about 900,000 population equivalent.
- Ministry of Energy and Water, Lebanon Daoura/Bourj Hammoud Wastewater Treatment Plant Feasibility Study, ESIA Scoping and Stakeholder Engagement Plan, Annex II (Nov 2020). energyandwater.gov.lb.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
Consultant Enviroplan S.A. and its consortium partners, prepared to EBRD requirements, proposing a moving bed bioreactor process. That a fresh feasibility study was commissioned fifteen years after the loan signature is the clearest evidence that no plant was built. No design flow, contractor or coordinates were established.