Taiz Urban Water Supply

Water transmission pipeline, 88 wells across five basins of which 21 operational; 2,650 m3/day produced from the Taizz city basin in 2023, against 6.43 million m3/year before the conflict in Yemen.

Stalled

The record

Country
Yemen
Location
Taiz
Coordinates
—
Technology
Water transmission pipeline
Capacity
88 wells across five basins of which 21 operational; 2,650 m3/day produced from the Taizz city basin in 2023, against 6.43 million m3/year before the conflict
Capital cost
—
Stage
Stalled
Owner or client
Taizz Local Water and Sanitation Corporation
Contractor
—
Operator
Taizz Local Water and Sanitation Corporation
Finance
Yemen Humanitarian Fund, US$2 million in 2025 for network reconnection; UNICEF rehabilitated wells in the al-Hyma and Habir field in 2018
Award or start year
2025
Commissioned
—

Record last checked 2026-09-18.

History

Sources

5 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Human Rights Watch, Death is More Merciful Than This Life: Houthi and Yemeni Government Violations of the Right to Water in Taizz (11 Dec 2023). hrw.org.
  2. The system comprises five basins, al-Hyma and Habir, al-Dhabab, al-Hawjala, al-Hawban and Taizz city, with 88 wells of which 21 remain operational; 22 operational wells in the Taizz city basin produced 2,650 cubic meters of water per day for a population of an estimated over 400,000; the network supplied 6,430,000 cubic meters a year before the conflict, falling to 900,000 cubic meters by 2021; 60 to 70 percent of Taizz water, sanitation and hygiene facilities have been destroyed or damaged.
  3. The report attributes violations to both parties to the conflict.
  4. United Nations in Yemen, The water authorities of Taiz agree to cooperate across front line (1 Jul 2025). yemen.un.org.
  5. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The Taiz City and Al-Hawban corporations reached a technical agreement to jointly manage water supply systems, with the Yemen Humanitarian Fund investing US$2 million to connect about 90,000 people. Four of the five basins are Ansar Allah held or on front lines while the corporation operates from the government-held city; that dispute is kept out of the row. Delivery against the 2025 agreement is not verified.