Mirfa 1 IWPP

MSF/RO + power, 52.5 MIGD (about 200,000 m3/day); retained MSF 22.5 MIGD (85,000 m3/day) and new SWRO 30 MIGD (114,000 m3/day) in United Arab Emirates.

Operational

The record

Country
United Arab Emirates
Location
Mirfa, Al Dhafra
Coordinates
24.119, 53.444
Technology
MSF/RO + power
Capacity
52.5 MIGD (about 200,000 m3/day); retained MSF 22.5 MIGD (85,000 m3/day) and new SWRO 30 MIGD (114,000 m3/day)
Capital cost
US$1.5 billion
Stage
Operational
Owner or client
Mirfa International Power & Water Company (TAQA 60%, Sojitz 20%, Engie 20%); ADWEA 60%, Engie 20% and Abu Dhabi Financial Group 20% at construction
Contractor
—
Operator
M Power O&M FZCO
Finance
Independent water and power project, about US$1.5 billion, 25-year power and water purchase agreement
Award or start year
2014
Commissioned
2017-11

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Engie, Mirfa Independent Water and Power Plant commences full operation in Abu Dhabi (7 November 2017). en.newsroom.engie.com.
  2. 1,600 MW and 52.5 MIGD (about 200,000 m3/day), US$1.5 billion, construction from October 2014, owned by Engie 20%, ADWEA 60% and Abu Dhabi Financial Group 20%; the scheme retained 22.5 MIGD (85,000 m3/day) of existing capacity and added a 30 MIGD (114,000 m3/day) greenfield RO plant.
  3. MIPCO, Environmental and Social Impact Assessment executive summary. mipco.ae.
  4. Gross water capacity 52.5 MIGD from retained MSF units of 22.5 MIGD plus a new 30 MIGD SWRO plant; the existing Al Mirfa plant had 38.7 MIGD and 140 MW. Engie Middle East, Mirfa asset fact sheet (2024). engiemiddleeast.com.
  5. Owner MIPCO, TAQA 60%, Sojitz 20%, Engie 20%, PCOD 2017, offtaker EWEC, PWPA to April 2042. TRANSCO, 2019 Seven Year Water Planning Statement (2020-2026), June 2019, Table 4.3 Existing Production Plant Site and Capacities by Technology. saudigulfprojects.com.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Gross 53 MIGD, MSF 23 and RO 30.