Liwa Strategic Water Storage and Recovery

Strategic storage, More than 26 million m3 stored; recharge 7 MIGD (about 32,000 m3/day), recovery 40 MIGD (about 182,000 m3/day) for 90 days in United Arab Emirates.

Operational

The record

Country
United Arab Emirates
Location
Liwa, Al Dhafra
Coordinates
—
Technology
Strategic storage
Capacity
More than 26 million m3 stored; recharge 7 MIGD (about 32,000 m3/day), recovery 40 MIGD (about 182,000 m3/day) for 90 days
Capital cost
US$350 million
Stage
Operational
Owner or client
TRANSCO (Abu Dhabi Transmission and Despatch Company), with the Environment Agency Abu Dhabi
Contractor
KN International (civil and structural works); an ACC and POSCO joint venture among the contractors
Operator
TRANSCO
Finance
Government of Abu Dhabi
Award or start year
2018
Commissioned
2018-01

Record last checked 2026-09-18.

History

Sources

7 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. KN International, Strategic Water Storage and Recovery Project, Liwa. kn-uae.com.
  2. Three recharge and recovery schemes, 315 recovery wells, 117 monitoring wells, three infiltration basins, three pumping stations and reservoirs, 155 km of well connection pipelines and 160 km of DN900 and DN1200 transmission pipelines; recharge 7 MIGD for 27 months and recovery 40 MIGD for 90 days; developer TRANSCO; construction value AED 1.3 billion; completion 2015. GRIPP and IWMI, Dawoud, M.A., A strategic water reserve in Abu Dhabi (16 August 2018). gripp.iwmi.org.
  3. Cost US$350 million.
  4. WaterWorld, World's largest man-made desalinated water reserve completed in Abu Dhabi (22 January 2018). waterworld.com.
  5. The National, Abu Dhabi unveils a Dh1.6bn underground reserve for desalinated water (15 January 2018). thenationalnews.com.
  6. TRANSCO, 2019 Seven Year Water Planning Statement, section on the Water Supply Scheme for the Aquifer Project (Contract G-4877). saudigulfprojects.com.
  7. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Infiltration of 7.0 MIGD and recovery of 40.0 MIGD of chlorinated groundwater for emergency supply to Abu Dhabi via Madinat Zayed and Mirfa. This site already carries a full case study of the scheme at the slug liwa-reserve, Liwa: the largest man-made reserve of drinking water, in the groundwater and aquifers hub.