Şanlıurfa Irrigation Tunnels

Irrigation tunnels, Two parallel tunnels, each 26.4 km long and 7.62 m internal diameter; 328 m3/s design discharge; command area about 476,000 ha in Turkey.

Operational

The record

Country
Turkey
Location
Bozova to Şanlıurfa and the Harran plain
Coordinates
—
Technology
Irrigation tunnels
Capacity
Two parallel tunnels, each 26.4 km long and 7.62 m internal diameter; 328 m3/s design discharge; command area about 476,000 ha
Capital cost
—
Stage
Operational
Owner or client
General Directorate of State Hydraulic Works (DSI), with the GAP Regional Development Administration
Contractor
—
Operator
DSI and local irrigation unions (sulama birlikleri)
Finance
—
Award or start year
1995
Commissioned
1995-04

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. GAP Regional Development Administration, Sanliurfa-Harran Ovalari 1. Asama Sulamasina Ait 1995 Yili Uygulamalarinin Degerlendirilmesi, March 1996. gap.gov.tr.
  2. States that the first agricultural step of GAP was taken when water was released through the Sanliurfa tunnels on 11 April 1995, that a first stage of 30,000 ha across 62 villages was opened to irrigation in the 1995 season, that 285 million m3 was drawn through the tunnels that season at a 69% irrigation efficiency over a 21,603 ha net area, and that the Harran main canal is 118 km long with an 80 m3/s capacity.
  3. Anadolu Agency, Harran Ovasi GAP ile ihya oldu, 17 July 2019. aa.com.tr.
  4. Gives two parallel tunnels 26.4 km long and 7.62 m in diameter from the Ataturk reservoir and a 9 November 1994 ceremony.
  5. International Water Power and Dam Construction, Re-analysis of Sanliurfa (May 2007, bot-walled to curl, returns 403). waterpowermagazine.com.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Gives 26.4 km and 7.62 m internal diameter per tube, about 9 m excavated diameter, 328 m3/s at about 3.5 m/s, internal water pressure of about 400 kPa, excavation and support completed in 2003 and contact grouting still in progress in 2007.