Birecik Dam and Hydroelectric Plant

Dam and hydroelectric scheme, 1,220 hm3 reservoir (56 km2 lake); 672 MW installed; 2,500 GWh/year; about 70,000 ha irrigation in Turkey.

Operational

The record

Country
Turkey
Location
Birecik, Şanlıurfa and Gaziantep
Coordinates
37.054, 37.890
Technology
Dam and hydroelectric scheme
Capacity
1,220 hm3 reservoir (56 km2 lake); 672 MW installed; 2,500 GWh/year; about 70,000 ha irrigation
Capital cost
US$1.09 billion
Stage
Operational
Owner or client
Birecik A.S. under a build-operate-transfer concession; transferred to EUAS on 4 October 2016
Contractor
Philipp Holzmann, Strabag and GAMA (Birecik A.S. consortium, about 43% of the shares); TEAS held 30%
Operator
Verbundplan Birecik Baraj Isletme (first 15 years), then EUAS
Finance
Project finance on a build-operate-transfer basis, largely export credits arranged through an international consortium of banks; first major Turkish BOT scheme
Award or start year
1995
Commissioned
2001-10

Record last checked 2026-09-18.

History

Sources

8 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. EUAS, Birecik-Nizip HEPP plant page. euas.gov.tr.
  2. Gives 672 MW (6 x 112 MW), 1,220 hm3 stored, 56 km2 lake, 2.5 billion kWh a year, first unit 26 August 2000, final unit 3 October 2001, and transfer to EUAS on 4 October 2016 at the end of the BOT term.
  3. P. Obernhuber, W. Zapletal and G. Zenz, Surveillance of Birecik Dam, 1st National Symposium and Exposition on Dam Safety, 28-30 May 2007. tugraz.elsevierpure.com.
  4. Gives two embankment sections plus a concrete gravity dam, maximum height 62.5 m, crest length 2,530 m, spillway designed for 17,353 m3/s, Birecik A.S. founded February 1995, construction from April 1996, operation from October 2000, 15-year BOT term, operation and maintenance by Verbundplan Birecik Baraj Isletme, majority held by Verbund-Austrian Hydro Power.
  5. GAMA Holding project page, 6x112 MW Birecik Hydroelectric Power Plant and Birecik Dam. holding.gama.com.tr.
  6. Gives 2.5 km of structure, 62.5 m height, 56 km2 reservoir, about 70,000 ha irrigated, April 1996 to September 2001, GAMA's own contribution US$223.4 million, and describes it as the first major Turkish finance-build-operate-transfer project.
  7. International Water Power and Dam Construction, Birecik: a role model for private companies (bot-walled to curl, returns 403). waterpowermagazine.com.
  8. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Puts construction cost at US$1.09 billion (DM 2.3 billion), names Philipp Holzmann, Strabag and Gama with about 43% and TEAS with 30%, financial closure 1995 and a 50-bank consortium.