Keban Dam and Hydroelectric Plant

Dam and hydroelectric scheme, 29,408 hm3 reservoir (675 km2 lake); 1,330 MW installed; 6,600 GWh/year in Turkey.

Operational

The record

Country
Turkey
Location
Keban, Elazığ
Coordinates
38.808, 38.757
Technology
Dam and hydroelectric scheme
Capacity
29,408 hm3 reservoir (675 km2 lake); 1,330 MW installed; 6,600 GWh/year
Capital cost
—
Stage
Operational
Owner or client
General Directorate of State Hydraulic Works (DSI)
Contractor
—
Operator
Elektrik Uretim A.S. (EUAS)
Finance
—
Award or start year
1965
Commissioned
1974

Record last checked 2026-09-18.

History

Sources

2 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. EUAS, Keban HEPP plant page. euas.gov.tr.
  2. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Gives 1,330 MW (4 x 157.5 MW and 4 x 175 MW), 29,408 hm3 reservoir, 675 km2 lake, combined concrete gravity and rockfill body 210.86 m high and 1,125.72 m long, 6.6 billion kWh a year, construction from 1963, foundations laid 1965, Keban-1 four units in 1974 and Keban-2 four further units in 1982.