Rabigh to Jeddah to Makkah Water Transmission System (RJM)

Water transmission pipeline, 1.82 million m3/day design; 1.25 million m3/day on the Rabigh to Jeddah route and 50,000 m3/day on the Rabigh to Mastorah route in Saudi Arabia.

Operational

The record

Country
Saudi Arabia
Location
Rabigh to Makkah
Coordinates
—
Technology
Water transmission pipeline
Capacity
1.82 million m3/day design; 1.25 million m3/day on the Rabigh to Jeddah route and 50,000 m3/day on the Rabigh to Mastorah route
Capital cost
—
Stage
Operational
Owner or client
Saline Water Conversion Corporation, now the Saudi Water Authority
Contractor
—
Operator
Water Transmission and Technologies Company
Finance
Saudi government capital budget
Award or start year
2021
Commissioned
2022

Record last checked 2026-09-18.

History

Sources

3 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Argaam, SWCC prepares for Rabigh-Jeddah-Makkah water transmission system launch in Q4 2021, 26 June 2021. argaam.com.
  2. a 650 km twin pipeline of 80-inch diameter with four pumping stations and 47 water tanks, carrying 1.82 million m3/day to Makkah, the Holy Sites, Jeddah, Taif and Baha, working alongside the existing Shuaibah systems, electricity use targeted below 2.75 kWh per cubic metre, operations from early 2023. Aesthetix, Saudi's SWCC deploys PLDS solutions from Aesthetix for the RJM Water Transmission System, 19 October 2022. aesthetixglobal.com.
  3. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

describes a 450 km system in the Makkah region running Rabigh to Jeddah at 1.25 million m3/day and Rabigh to Mastorah at 50,000 m3/day, with reservoirs, pumping stations, hydraulic control, communications and a control centre, and states SWCC has completed constructing it. The two sources differ on length and headline capacity and both figures are given. Coordinates left blank because the row describes a corridor rather than a site.