Jubail to Riyadh Water Transmission System (RWTS)

Water transmission pipeline, 830,000 m3/day as built; 1.2 million m3/day on phase 3, 815 km in Saudi Arabia.

Operational

The record

Country
Saudi Arabia
Location
Jubail to Riyadh
Coordinates
—
Technology
Water transmission pipeline
Capacity
830,000 m3/day as built; 1.2 million m3/day on phase 3, 815 km
Capital cost
—
Stage
Operational
Owner or client
Saline Water Conversion Corporation, now the Saudi Water Authority
Contractor
Mannesmann Anlagenbau and the Al Rashid-HAK consortium (original system); Limak (pumping stations and reservoirs, 2018-2023)
Operator
Water Transmission and Technologies Company
Finance
Saudi government capital budget
Award or start year
1987
Commissioned
1987

Record last checked 2026-09-18.

History

Sources

5 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. BGG Consult Dr Peter Waibel ZT-GmbH, Water Pipelines RWTS and MTTS, Saudi Arabia. bgg.at.
  2. the Riyadh Water Transmission System runs about 500 km from the Gulf to Riyadh as a twin pipeline of 150 cm diameter, carries 830,000 m3/day through six pumping stations and climbs 700 m, built for the Mannesmann Anlagenbau and Al Rashid-HAK joint venture between 1980 and 1987. Saline Water Conversion Corporation, Annual Report 2022 (English), Production Plants Map, p. 73. swcc.gov.sa.
  3. lists the Al-Jubail to Riyadh transmission system phase 3 at 815 km and 1.2 million m3/day among implemented projects, and a reconstruction of the Al-Jubail to Riyadh pipeline A-B at up to 850,000 m3/day among ongoing projects.
  4. Limak project page, Jubail-Riyadh Water Transmission Line, Saudi Arabia. limak.com.tr.
  5. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

one main and two intermediate pumping stations plus 14 steel water storage tanks, seven in Jubail and seven in Riyadh, each 170,000 m3, 2.38 million m3 in total, started September 2018, substantial completion July 2023. Coordinates left blank because the row describes a corridor of about 500 km rather than a site.