Tanger Boukhalef Wastewater Plant

Wastewater treatment + reuse, 11,000 m3/day originally with 5,000 m3/day of tertiary treatment, plus a 32,000 m3/day extension in Morocco.

Operational

The record

Country
Morocco
Location
Tanger
Coordinates
35.720, -5.930
Technology
Wastewater treatment + reuse
Capacity
11,000 m3/day originally with 5,000 m3/day of tertiary treatment, plus a 32,000 m3/day extension
Capital cost
—
Stage
Operational
Owner or client
Commune de Tanger under delegated management
Contractor
Not identified in the sources consulted
Operator
Amendis, a Veolia Maroc subsidiary
Finance
214 million dirhams for the extension
Award or start year
2015
Commissioned
2015-10

Record last checked 2026-09-20.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Aujourd'hui le Maroc, Extension de la station d'epuration Boukhalef: plus de 90% des travaux acheves (Apr 2021). aujourdhui.ma.
  2. Existing capacity 11,000 m3/day with 5,000 m3/day treated to tertiary standard; the extension adds 32,000 m3/day for 214 million dirhams on a 4.8 ha site in the Gzenaya commune, was more than 90% complete in April 2021, and extends collection to Assilah; treated water already irrigates about 100 ha a day, with the Royal Golf and Assilah green spaces to follow.
  3. Amendis, Assainissement liquide. amendis.ma.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Boukhalef was inaugurated in 2015 and uses biological treatment, filtration then disinfection, with the output reused for irrigation; most of Tangier's remaining sewage is pretreated at the port and discharged through a marine outfall 2.2 km offshore. Coordinates are the OpenStreetMap wastewater plant in the Tangier free zone at Gueznaia, the Boukhalef site, given to two decimals because the feature is unnamed.