Sebou–Bouregreg Water Highway

Interbasin transfer pipeline, 15 m3/s design flow; initial forecast 350 to 400 million m3/year, close to 500 million m3 in the first year and 953 million m3 in total between August 2023 and December 2025 in Morocco.

Operational

The record

Country
Morocco
Location
Kénitra
Coordinates
—
Technology
Interbasin transfer pipeline
Capacity
15 m3/s design flow; initial forecast 350 to 400 million m3/year, close to 500 million m3 in the first year and 953 million m3 in total between August 2023 and December 2025
Capital cost
US$600 million
Stage
Operational
Owner or client
Ministère de l'Équipement et de l'Eau
Contractor
SGTM (Société générale des travaux du Maroc)
Operator
Ministère de l'Équipement et de l'Eau
Finance
—
Award or start year
2022
Commissioned
2023-08

Record last checked 2026-09-18.

History

Sources

8 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Le360, En images, l'autoroute de l'eau Sebou-Bouregreg (Jan 2025). fr.le360.ma.
  2. 67 km of 3,200 mm steel pipe, two pumping stations rated 15 m3/s combined, 6 billion dirhams, works launched December 2022 and water flowing from 28 August 2023, serving about 12 million people between Rabat and Casablanca.
  3. Policy Center for the New South, Desalinisation, barrages et autoroutes de l'eau, PP-19/25 (May 2025). policycenter.ma.
  4. First reach of 70 km from the Sebou to the Sidi Mohammed Ben Abdellah dam, with a 340 km second reach planned to the Oum Er Rbia; close to 500 Mm3 moved in the first year against an initial forecast of 350 to 400 Mm3, averaging 39 Mm3 a month at more than 13 m3/s.
  5. Le360, Barrages, dessalement, transferts d'eau: comment le Maroc restructure son mix hydrique (Mar 2026). fr.le360.ma.
  6. 953 Mm3 transferred between August 2023 and December 2025 at 15 m3/s for 6 billion dirhams; a second phase of about 210 km at 30 to 45 m3/s toward the Oum Er Rbia is to start at the end of 2026, and a Laou-Loukkos-Sebou phase is planned.
  7. Novacim, Autoroute de l'eau: interconnexion des bassins de Sebou et Bouregreg. novacim.com.
  8. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The cement supplier's project sheet names SGTM as the works contractor and SNCE as engineer, over 2022 to 2023, for 66.7 km of pipe, 5,000 m3 of reservoirs, pumping stations rated 15 m3/s, associated electrical works, a budget of 6 billion dirhams and an annual transfer of 350 to 400 million m3 of drinking water.