Brissa Dam

Dam (storage and irrigation), 1,750,000 m3 reservoir at normal water level; maximum ever impounded about 450,000 m3 in Lebanon.

In tender

The record

Country
Lebanon
Location
Sir Ed-Danniyeh
Coordinates
34.375, 36.107
Technology
Dam (storage and irrigation)
Capacity
1,750,000 m3 reservoir at normal water level; maximum ever impounded about 450,000 m3
Capital cost
—
Stage
In tender
Owner or client
Council for Development and Reconstruction
Contractor
—
Operator
—
Finance
—
Award or start year
2024
Commissioned
2009

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Council for Development and Reconstruction, Brissa Dam and Reservoir, Full Lining and Additional Water Diversion, Caza of Danniyeh, Tender Documents, Technical Specifications Volume II (Sep 2024). cdr.gov.lb.
  2. Dam construction was launched in 2003 and completed in 2009; the first impoundment in 2009 leaked so badly that water level remained only a few metres above the bottom; clay core embankment dam on karstic limestone and weathered basalt, embankment height 30 m at the upstream toe and 45 m at the downstream toe, crest about 600 m by 8 m, dam volume about 1,250,000 m3, reservoir volume 1,750,000 m3 at normal water level of 1,969 m; in 2011 inflow was so small that the maximum level reached corresponded to almost 450,000 m3, with seepage estimated at 30 to 40 litres per second.
  3. The owner is tendering a full reservoir lining.
  4. Coordinates from OpenStreetMap.
  5. Al Rawiya (19 Feb 2021) dates completion to 2013, which the owner's document contradicts. al-rawiya.com.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Whether the lining contract has since been awarded was not established.