Bourj Hammoud Wastewater Treatment Plant

Wastewater treatment, About 900,000 population equivalent; no design flow published in Lebanon.

Planned

The record

Country
Lebanon
Location
Bourj Hammoud
Coordinates
—
Technology
Wastewater treatment
Capacity
About 900,000 population equivalent; no design flow published
Capital cost
—
Stage
Planned
Owner or client
Council for Development and Reconstruction
Contractor
—
Operator
—
Finance
European Investment Bank loan of EUR 60 million within a EUR 155 million project; later feasibility work funded by the EBRD
Award or start year
2005
Commissioned
—

Record last checked 2026-09-18.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. European Investment Bank, Greater Beirut Wastewater (project 19982326). eib.org.
  2. Promoter the Council for Development and Reconstruction; EIB finance EUR 60 million against a total cost of EUR 155 million; signed 28 December 2005; the project covers construction of a wastewater treatment plant and preliminary treatment at Dora, rehabilitation or reconstruction of the existing sea outfall and related collectors and networks, for about 900,000 population equivalent.
  3. Ministry of Energy and Water, Lebanon Daoura/Bourj Hammoud Wastewater Treatment Plant Feasibility Study, ESIA Scoping and Stakeholder Engagement Plan, Annex II (Nov 2020). energyandwater.gov.lb.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Consultant Enviroplan S.A. and its consortium partners, prepared to EBRD requirements, proposing a moving bed bioreactor process. That a fresh feasibility study was commissioned fifteen years after the loan signature is the clearest evidence that no plant was built. No design flow, contractor or coordinates were established.