Tehran Fifth Water Treatment Plant

Water treatment plant, 7.5 m3/s design capacity, about 648,000 m3/day in Iran.

Operational

The record

Country
Iran
Location
Tehran
Coordinates
—
Technology
Water treatment plant
Capacity
7.5 m3/s design capacity, about 648,000 m3/day
Capital cost
—
Stage
Operational
Owner or client
Tehran Province Water and Wastewater Company
Contractor
Peyman Ab Gostar for civil works and Machine Sazi Vijeh for equipment
Operator
Tehran Province Water and Wastewater Company
Finance
Government of Iran
Award or start year
2004
Commissioned
2004

Record last checked 2026-09-20.

History

Sources

2 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Tehran Province Water and Wastewater Company, Introduction to the water treatment plants of the city of Tehran, page last updated 4 Shahrivar 1397 (26 August 2018), read through the Internet Archive because tww.tpww.ir no longer resolves outside Iran. web.archive.org.
  2. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The page opens by stating that Tehran has five treatment plants in operation and then gives, for each, the consultant, the designer and contractor, the year of entry into service and the design capacity. Decimal figures on that page are stored with the digit groups reversed, so the design capacities printed as 7/2 and 5/7 cubic metres per second are 2.7 and 7.5, and the Telo tunnel printed as 7/2 metres is 2.7 metres. The reversal is confirmed by the raw water channel dimensions on the same page, printed as 26/38 metres long, 6-5/9 metres wide and 4-8/6 metres deep, which only read sensibly as 38.26 m, 9.5 to 6 m and 6.8 to 4 m. Raw water arrives from the Lar dam after about 40 km and enters a 3,600 mm tunnel; the raw water channel downstream of the tunnel is 38.26 m long, 9.5 to 6 m wide and 6.8 to 4 m deep.