Bushehr Desalination

Seawater RO, 39,500 m3/day contracted, being 22,500 m3/day in phases 1 and 2 and 17,000 m3/day in phase 4; 45,000 m3/day final nominal, being 25,000 and 20,000 m3/day; the contractor heads the site 40,000 m3/day in Iran.

Operational

The record

Country
Iran
Location
Bushehr
Coordinates
28.907, 50.818
Technology
Seawater RO
Capacity
39,500 m3/day contracted, being 22,500 m3/day in phases 1 and 2 and 17,000 m3/day in phase 4; 45,000 m3/day final nominal, being 25,000 and 20,000 m3/day; the contractor heads the site 40,000 m3/day
Capital cost
—
Stage
Operational
Owner or client
Bushehr Province Water and Wastewater Company
Contractor
NVCo, with design and equipment by Axiom and B2A of Austria
Operator
NVCo
Finance
Export Development Bank of Iran, on build, own and operate contracts running 15 years from start-up
Award or start year
2013
Commissioned
2016

Record last checked 2026-09-20.

History

Sources

2 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. NVCo, Bushehr 40,000 m3/day SWRO desalination plant (project page). nvco.org.
  2. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Client the Bushehr Province Water and Wastewater Company for the supply of potable water to the city of Bushehr, financed by the Export Development Bank of Iran on build, own and operate contracts of 15 years from start-up. Phases I and II awarded 2013 and started up 2016 at a contractual 22,500 m3/day and a final 25,000 m3/day; phase IV awarded 2020 and started up 2022 at a contractual 17,000 m3/day and a final 20,000 m3/day. Open intake from the Persian Gulf with chlorination, pretreatment, cartridge filters, high pressure pumps, pressure vessels and membranes, CIP unit, raw water and permeate tanks, dosing, instrumentation and PLC, substation and panels; a 7 km transfer pipeline runs from the concrete permeate tank to the city network. The page's headline figure of 40,000 m3/day matches neither the sum of the contractual capacities nor the sum of the final capacities.