Bahr El-Baqar Wastewater Treatment

Wastewater treatment + reuse, 5.6M m3/day (state and Guinness); 5.0M m3/day (Acciona and Arab Fund) in Egypt.

Operational

Landmark Agricultural drainage treated at a scale nothing else matches, to irrigate reclaimed land in Sinai.

The record

Country
Egypt
Location
Port Said
Coordinates
30.900, 32.200
Technology
Wastewater treatment + reuse
Capacity
5.6M m3/day (state and Guinness); 5.0M m3/day (Acciona and Arab Fund)
Capital cost
US$740 million
Stage
Operational
Owner or client
Armed Forces Engineering Authority
Contractor
Orascom / Arab Contractors
Operator
Orascom Construction (10-year O&M from December 2021)
Finance
Government
Award or start year
2021
Commissioned
2021-09

Record last checked 2026-09-04.

History

Sources

2 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Egyptian Streets, inauguration report, 27 Sep 2021. egyptianstreets.com.
  2. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

(four lines of 1.25 million m3/day; EGP 20 billion; Arab Contractors and Orascom Construction joint venture). Orascom Construction project page for the O&M term. Capacity is disputed: the state, the contractors and Guinness use 5.6 million m3/day, while Acciona, the Arab Fund and Egypt's Minister of Planning use 5.0 million. Four treatment lines of 1.25 million give 5.0; four intake buildings of 1.4 million give 5.6.