New Administrative Capital Wastewater Plant
Wastewater treatment + reuse, 250,000 m3/day (first phase) in Egypt.
Under construction
The record
- Country
- Egypt
- Location
- New Administrative Capital
- Coordinates
- 30.020, 31.750
- Technology
- Wastewater treatment + reuse
- Capacity
- 250,000 m3/day (first phase)
- Capital cost
- —
- Stage
- Under construction
- Owner or client
- Government of Egypt; New Administrative Capital for Urban Development
- Contractor
- Hassan Allam Construction
- Operator
- —
- Finance
- Government
- Award or start year
- 2022
- Commissioned
- —
Record last checked 2026-09-18.
History
- 2022
Hassan Allam Construction engaged for the 250,000 m3/day plant under a turnkey design and build contract
- 2025-11
New Administrative Capital authority reports the plant still under implementation
Sources
4 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- Hassan Allam, New Capital Wastewater Treatment Plant. hassanallam.com.
- Will treat 250,000 m3/day of wastewater for reuse; client the Government of Egypt; year 2022; fully integrated engineering, procurement and construction, with turnkey design and build covering hydraulic, civil and electromechanical works, start-up testing and a two-year warranty from preliminary acceptance.
- Al-Dostor, Completion of the construction of the wastewater treatment plant in the Administrative Capital (Arabic), 23 November 2025. dostor.org.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
The head of the New Administrative Capital authority reports the first phase at a design capacity of about 250,000 m3/day still under implementation, with treated water reused to irrigate green space in the new capital and neighbouring cities.