New Administrative Capital Wastewater Plant

Wastewater treatment + reuse, 250,000 m3/day (first phase) in Egypt.

Under construction

The record

Country
Egypt
Location
New Administrative Capital
Coordinates
30.020, 31.750
Technology
Wastewater treatment + reuse
Capacity
250,000 m3/day (first phase)
Capital cost
—
Stage
Under construction
Owner or client
Government of Egypt; New Administrative Capital for Urban Development
Contractor
Hassan Allam Construction
Operator
—
Finance
Government
Award or start year
2022
Commissioned
—

Record last checked 2026-09-18.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Hassan Allam, New Capital Wastewater Treatment Plant. hassanallam.com.
  2. Will treat 250,000 m3/day of wastewater for reuse; client the Government of Egypt; year 2022; fully integrated engineering, procurement and construction, with turnkey design and build covering hydraulic, civil and electromechanical works, start-up testing and a two-year warranty from preliminary acceptance.
  3. Al-Dostor, Completion of the construction of the wastewater treatment plant in the Administrative Capital (Arabic), 23 November 2025. dostor.org.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The head of the New Administrative Capital authority reports the first phase at a design capacity of about 250,000 m3/day still under implementation, with treated water reused to irrigate green space in the new capital and neighbouring cities.