In Salah–Tamanrasset Water Conveyance

Fossil groundwater conveyance, 100,000 m3/day design, about 36.5 million m3/year, over 746 km; opened at 50,000 m3/day with the design flow targeted for 2030 in Algeria.

Operational

Landmark Fossil water drawn from the Continental Intercalaire and pushed 746 km across the Sahara to Tamanrasset.

The record

Country
Algeria
Location
Tamanrasset
Coordinates
22.786, 5.529
Technology
Fossil groundwater conveyance
Capacity
100,000 m3/day design, about 36.5 million m3/year, over 746 km; opened at 50,000 m3/day with the design flow targeted for 2030
Capital cost
—
Stage
Operational
Owner or client
Ministère des Ressources en Eau; Algérienne des Eaux
Contractor
CGC-SIPSC of China and the Cosider, Zakhem and Erciyas consortium
Operator
Algérienne des Eaux, through a dedicated public industrial and commercial establishment
Finance
197 billion Algerian dinars
Award or start year
2008
Commissioned
2011-03

Record last checked 2026-09-18.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Algerienne des Eaux, Transfert In Salah-Tamanrasset. ade.dz.
  2. The operator's own page: water is drawn from the Continental Intercalaire aquifer through forty-seven deep boreholes about 70 km north of In Salah, treated in six reverse osmosis demineralisation stations, gathered in a 50,000 m3 head reservoir and moved 746 km to Tamanrasset through 1,254,765 linear metres of welded steel pipe between 700 mm and 1,400 mm, lifted by six pumping stations and stored in a 50,000 m3 terminal reservoir, with 1,468,500 m of fibre optic for remote management; 100,000 m3 a day are transferred, serving In Salah, Arak, Menier, Moulay Hassan, In Ekker and In Amguel on the way.
  3. Algerie360, Transfert d'eau In Salah-Tamanrasset: un mega projet devenu realite (Mar 2011). algerie360.com.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Puts the cost at 197 billion dinars, names the CGC-SIPSC and Cosider, Zakhem and Erciyas consortia, records the opening by the water resources minister, and says the scheme opened at 50,000 m3/day doubling to 100,000 m3/day by 2030 while Tamanrasset's 337,400 residents then needed about 25,000 m3/day; about 120,000 people benefit. Coordinates are those of Tamanrasset, the delivery end, from OpenStreetMap. Sources round the length to 750 km; the operator's 746 km is used.