CountriesKnowledge Hubs
Data & Tools
Region AtlasMajor ProjectsPPP Pipeline & AwardsLive tendersWhere to find live tendersTariffs & cost benchmarksOrganization DirectoryMarketsIntelligenceStoriesCalendarAbout

Water for the machines: data centres in the desert

The Gulf is announcing AI campuses at gigawatt scale in the world’s most water-scarce region. What cooling actually draws, what operators disclose, and the column they leave blank.

Technology brief Last reviewed September 2026 ~7 min read
0.84
litres withdrawn per kWh of IT load, the industry average AWS cites
0.12
litres per kWh across AWS’s global fleet in 2025
2.85
litres per kWh at AWS’s Jakarta region, the hot and humid extreme
125
million litres a year Microsoft says its closed-loop design avoids per data centre

Gigawatt-scale AI campuses are being announced across the Gulf. Stargate UAE is planned as a 1 GW cluster in Abu Dhabi, with 200 MW expected live in 2026.1 HUMAIN plans AI factories of up to 500 MW in Saudi Arabia, and DataVolt a 1.5 GW campus at Oxagon.23 None of these announcements says how the machines will be cooled, or what water they will draw.

The cooling fork

Operators state the trade-off plainly. Microsoft notes that water has traditionally been evaporated on site to cut the power demand of cooling. Replacing evaporative systems with mechanical cooling, it says, raises power usage effectiveness.4 Google puts the other side in numbers: water-cooled data centres use about 10% less energy than many air-cooled ones.8 Water and electricity substitute for each other, and in the Gulf both are manufactured.

The newest answer moves cooling to the chip. Microsoft’s design, launched in August 2024 for AI workloads, circulates water in a closed loop between servers and chillers, filled once during construction. The company says it avoids more than 125 million litres a year per data centre.4 Across its fleet, Microsoft’s water usage fell from 0.49 litres per kWh in 2021 to 0.30.4

Water withdrawn per unit of computing

Water usage effectiveness, litres per kWh of IT load, latest figure each operator publishes

AWS, Jakarta (2025)2.85 LAWS, Singapore (2025)1.57 LIndustry average cited by AWS0.84 LMicrosoft fleet (FY2024)0.3 LMeta fleet (2023)0.18 LAWS global (2025)0.12 LAWS, Stockholm (2025)0.02 L

Withdrawal per kWh of IT load as each operator defines it.546 AWS publishes no water figure for its Bahrain and UAE regions, and Google publishes no fleet ratio.

Heat is the variable

AWS’s regional table shows what climate does. Its Stockholm region withdrew 0.02 litres per kWh in 2025, Singapore 1.57 and Jakarta 2.85.5 The same company draws more than a hundred times as much water where the air is hot and humid. For its two Gulf regions AWS publishes power effectiveness, 1.33 in Bahrain and 1.25 in the UAE for 2025, and leaves the water column blank.5 The regions where the number matters most are the ones without it.

The arithmetic at gigawatt scale

A 1 GW campus at full IT load uses 24 million kWh a day. At the industry-average 0.84 litres per kWh, that is about 20,000 cubic metres of water a day; at AWS’s 2025 fleet figure, about 2,900. Both are illustrations on published ratios, not disclosures. For scale, Taweelah, the largest reverse-osmosis plant in the region, is contracted for 909,201 cubic metres a day.9 Even at the industry average, a gigawatt of computing draws about 2% of that.

Absolute totals are rising anyway. Google’s data centres and offices consumed about 31 million cubic metres of water in 2024. The company reports that 72% of its freshwater withdrawals came from sources at low risk of depletion or scarcity.7 Meta’s fleet ran at 0.18 litres per kWh in 2023, down from 0.30 in 2020.6

What to ask for

Water should be a named line in these deals, and disclosure should be regional. Three questions separate a considered campus from an announcement. Which cooling design is specified, and what power penalty was accepted for it? Where does make-up water come from: potable supply, treated effluent or desalination built for the site? And will the operator publish water usage effectiveness for the region, as it already does for power?

Treated effluent is the obvious answer, and district cooling shows its limits. Qatar Cool switched its two West Bay plants entirely from potable water to treated sewage effluent, and Qatar Foundation converted its cooling plants by 2023.1314 In Dubai, Empower’s recycled water share fell from 13.1% in 2023 to 8.3% in 2024, after reduced and poorer supply following the April 2024 rains. It recovered to 9.22% in 2025.1011 Tabreed reported buying more potable water in 2025 because less effluent was available.12 A campus that plans on effluent needs a contract for it, and a fallback.

In the region

The announcements so far are about power and chips. Stargate UAE names G42, Oracle, NVIDIA, Cisco and SoftBank as partners.1 HUMAIN describes its first deployment as an 18,000 NVIDIA GB300 Grace Blackwell AI supercomputer.2 DataVolt says its Oxagon campus will use advanced cooling technologies and run on renewable power.3 None of the three announcements gives a water figure.

The operators that have said anything are cautious. Khazna told Rest of World it is exploring treated sewage effluent at some of its UAE facilities, and its Ajman site uses closed-loop liquid cooling.1516 Google told Arab News it might consider seawater for its planned hub in Dammam.17 One regional policy analysis found no overarching strategy for steering treated effluent to data centres, and purple-pipe networks too limited to carry it.18

What to watch

  • 2026Stargate UAE’s first 200 MW is expected to go live in Abu Dhabi.1
  • 2028DataVolt’s first phase at Oxagon, funded with US$5 billion, is expected to be operational.3

Further reading

Sources

18 references
  1. OpenAI, “Introducing Stargate UAE”, 22 May 2025, archived copy.
  2. NVIDIA Newsroom, announcement of the HUMAIN and NVIDIA partnership on AI factories in Saudi Arabia, 13 May 2025.
  3. W.Media, “DataVolt to build DC in Riyadh, AI DC campus in NEOM-Oxagon”, February 2025 (archived), quoting DataVolt’s press release.
  4. Solomon, S., “Sustainable by design: next-generation datacenters consume zero water for cooling”, Microsoft Cloud Blog, 9 December 2024.
  5. Amazon, AWS Cloud sustainability disclosures, including the regional PUE and WUE table, accessed September 2026.
  6. Meta, 2024 Sustainability Report, data centre PUE and WUE, 2019–2023.
  7. Google, 2025 Environmental Report.
  8. Google, “Our commitment to climate-conscious data center cooling”, November 2022.
  9. ACWA Power, Taweelah RO desalination IWP: 909,201 m³/day.
  10. Empower, Integrated Annual Report 2024: recycled water usage and reverse-osmosis capacity.
  11. Technical Review Middle East, report on Empower’s recycled water use in 2025, 2026.
  12. Tabreed, FY 2025 management discussion and analysis, February 2026, p. 6.
  13. Qatar Tribune, report on Qatar Cool’s switch to treated sewage effluent in West Bay, 14 August 2017.
  14. Qatar News Agency, “QF district cooling plants transformed to treated sewage water”, 24 December 2023.
  15. Rest of World, report on AI data centres and Gulf water, 4 August 2025.
  16. Rest of World, report on Khazna Data Centers, 19 September 2025.
  17. Arab News, report on data-centre water use in Saudi Arabia, 21 August 2025.
  18. Middle East Council on Global Affairs, analysis of Gulf AI data centres, water and energy.

Numbered references are linked from the superscript markers in the text. Figures without a marker come from the sources above as compiled in the site methodology.