Gerede Water Transfer Tunnel

Interbasin transfer tunnel, 31.6 km tunnel, 4.5 m diameter; 226 million m3/year transferred by gravity in Turkey.

Operational

The record

Country
Turkey
Location
Gerede (Bolu) to Çamlıdere, Ankara
Coordinates
40.388, 32.383
Technology
Interbasin transfer tunnel
Capacity
31.6 km tunnel, 4.5 m diameter; 226 million m3/year transferred by gravity
Capital cost
—
Stage
Operational
Owner or client
General Directorate of State Hydraulic Works (DSI)
Contractor
—
Operator
DSI, delivering to ASKI at the Camlidere reservoir
Finance
—
Award or start year
2020
Commissioned
2020

Record last checked 2026-09-18.

History

Sources

3 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Ministry of Agriculture and Forestry, Turkiye'nin en uzun icme suyu tuneli baskente ilk 6 ayda 166 milyon metrekup su tasidi, 29 July 2020. tarimorman.gov.tr.
  2. Gives a 31.6 km tunnel of 4.5 m diameter bored by three tunnel boring machines, 226 million m3 a year transferred to Ankara by gravity, 166 million m3 delivered in the first six months of operation, a total investment of about 1.273 billion lira, a route from south east of Gerede in Bolu to the Camlidere dam, and a design horizon to 2050. Hurriyet, Ankara'ya dev su projesi, 12 January 2011. hurriyet.com.tr.
  3. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Records the tunnel section of 31,592 m at 4.5 m diameter with a 40 m3/s capacity, contractor Kolin Insaat and Japanese credit financing. Camlidere dam coordinates, the tunnel outlet, from OpenStreetMap.