Tunis Nord Wastewater and Borj Touil Reuse

Wastewater treatment + reuse, Two 2,000 mm mains of 2.5 to 3 km carrying effluent from four plants to a 6 m3/s pumping station, a 6 km sea outfall discharging at 20 m depth, and reuse in the Borj Touil irrigation perimeter in Tunisia.

Operational

The record

Country
Tunisia
Location
Tunis and Ariana
Coordinates
—
Technology
Wastewater treatment + reuse
Capacity
Two 2,000 mm mains of 2.5 to 3 km carrying effluent from four plants to a 6 m3/s pumping station, a 6 km sea outfall discharging at 20 m depth, and reuse in the Borj Touil irrigation perimeter
Capital cost
US$60 million
Stage
Operational
Owner or client
ONAS
Contractor
—
Operator
ONAS, with the CRDA operating the irrigation pumping station
Finance
World Bank and the Global Environment Facility
Award or start year
2021
Commissioned
2021

Record last checked 2026-09-18.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, Recyclage des eaux usees en Tunisie, une mer plus propre et de l'eau pour les agriculteurs, 30 Aug 2022. banquemondiale.org.
  2. Northern Tunis Wastewater Project, 60.6 million dollars, completed 2021, financed by the World Bank and the Global Environment Facility; two parallel buried mains from the Choutrana works, the El Hissiene settling basin and a 6 km sea outfall discharging at 20 m depth in the Gulf of Tunis; about 500 farmers at Borj Touil use the recycled water; by 2020, 96 per cent of seawater samples met bacterial standards and the Raoued beach reopened to swimmers.
  3. ONAS and Agua Services d'Assainissement, SGES Concession Lot 1 Tunis Nord, June 2026. onas.nat.tn.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Describes the two parallel reinforced concrete mains of 2,000 mm and 2.5 to 3 km, one carrying Choutrana 2 and Charguia effluent and the other Choutrana 1 and Cotiere Nord, both converging on the CRDA pumping station that feeds the Borj Touil irrigation perimeter, with a 6 m3/s main pumping station and two storage basins upstream of the sea outfall.