Northern Waters Transfer to the Sahel and Sfax
Water transmission pipeline, About 28 km of ductile iron and prestressed concrete mains of 1,250 to 1,600 mm; a treatment complex at Kalaa Kebira of 4 m3/second; four semi-buried reservoirs totalling 30,000 m3 in Tunisia.
The record
- Country
- Tunisia
- Location
- Enfidha to Kalaa Kebira
- Coordinates
- —
- Technology
- Water transmission pipeline
- Capacity
- About 28 km of ductile iron and prestressed concrete mains of 1,250 to 1,600 mm; a treatment complex at Kalaa Kebira of 4 m3/second; four semi-buried reservoirs totalling 30,000 m3
- Capital cost
- US$77 million
- Stage
- Planned
- Owner or client
- SONEDE
- Contractor
- —
- Operator
- SONEDE
- Finance
- Agence Francaise de Developpement loan of EUR 60 million, revised to 240 million dinars or about EUR 71.42 million at June 2024
- Award or start year
- 2024
- Commissioned
- —
Record last checked 2026-09-18.
History
- 2024-06
SONEDE records the project cost revised to 240 million dinars, about EUR 71.42 million
Sources
2 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- SONEDE, Securisation et renforcement des infrastructures de transfert des eaux du Nord pour les regions du Sahel et Sfax. sonede.com.tn.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
About 28 km of mains of 1,250 to 1,600 mm, a pressure break chamber at Enfidha, semi-buried reservoirs at Znatir, Belli and Bouaargoub totalling 30,000 m3, a treatment complex at Kalaa Kebira of 4 m3/second, energy recovery and pumping stations; AFD loan of EUR 60 million revised to 240 million dinars, about EUR 71.42 million, at June 2024. SONEDE gives no start date, completion date or construction status.