Mellègue Supérieur Dam
Dam (storage and irrigation), 195 million m3, reported as close to 200 million m3 in 2026 in Tunisia.
The record
- Country
- Tunisia
- Location
- Nebeur, Kef governorate
- Coordinates
- —
- Technology
- Dam (storage and irrigation)
- Capacity
- 195 million m3, reported as close to 200 million m3 in 2026
- Capital cost
- US$92 million
- Stage
- Under construction
- Owner or client
- Ministry of Agriculture, Water Resources and Fisheries, Directorate General of Dams and Major Hydraulic Works
- Contractor
- Chinese companies, not named in the source
- Operator
- —
- Finance
- —
- Award or start year
- 2016
- Commissioned
- —
Record last checked 2026-09-20.
History
- 2016
works begin on the upper Mellegue dam
- 2024-04
progress reported at 84 per cent
- 2025-04
progress reported at 96 per cent
- 2026-08
progress reported at about 90 per cent with commissioning set for 15 September 2026
Sources
11 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- Webdo, Barrage Mellegue: la fin des travaux, entames en 2016, est prevue pour 2025, 23 April 2024, citing Tunis Afrique Presse and project manager Lotfi Abbes. webdo.tn.
- Works had reached 84 per cent and were expected to finish in December 2025. Cost is estimated at 276 million dinars.
- The dam replaces the old Mellegue-Nebeur dam and will store 195 million m3, create about 13,000 hectares of new irrigation in the Sakiet Sidi Youssef, Trouif and Kef Ouest delegations, and protect Jendouba, Bou Salem and towns near the Medjerda basin from flooding.
- La Presse de Tunisie, Cinq nouveaux barrages en cours de realisation en Tunisie, 23 April 2025, citing the director general of dams and major hydraulic works Faiz Moslem. lapresse.tn.
- Works on the upper Mellegue dam stood at 96 per cent with commissioning expected by the end of that year.
- La Presse de Tunisie, Kef: achevement imminent du nouveau barrage de Mellegue superieur, 18 June 2026. lapresse.tn.
- The new upper Mellegue dam, built by Chinese companies, is in its final phase, commissioning was expected in September and irrigation capacity is put at 12,000 to 13,000 hectares, while the old dam should be kept and rehabilitated as a complement.
- Webdo, Tunisie: Douimis, Mellegue 2, Raghai, ces barrages en construction qui pourraient changer la donne hydraulique, 6 August 2026. webdo.tn.
- The Minister of Agriculture, Water Resources and Fisheries, Ezzeddine Ben Cheikh, called for works at about 90 per cent to be accelerated, commissioning was planned for 15 September 2026, storage is estimated at close to 200 million m3, cost at 276 million dinars, and the reservoir is to start filling in the coming rainy season.
- Radio Tunis Chaine Internationale, Barrage de Mellegue 2: mise en service prochaine, 29 August 2026. rtci.tn.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
Works were ending and the dam should be commissioned shortly, with retention capacity close to 200 million m3. Reported progress does not run in one direction, 84 per cent in April 2024 and 96 per cent in April 2025 against about 90 per cent in August 2026, and the figures are recorded as published. No source opened confirms that commissioning took place on the announced date, so the stage stays Under construction. Budget converted from 276 million dinars at about three dinars to the dollar, the rate the register already uses for Tunisian costs. The name avoids Mellegue 2 so that it cannot be read as a variant of the existing Mellegue Dam row, which is the 1954 Nebeur structure.