Bizerte Wastewater Plant
Wastewater treatment, 26,600 m3/day (250,000 population equivalent), 10,740 kg BOD5/day in Tunisia.
Operational
The record
- Country
- Tunisia
- Location
- Bizerte
- Coordinates
- 37.250, 9.790
- Technology
- Wastewater treatment
- Capacity
- 26,600 m3/day (250,000 population equivalent), 10,740 kg BOD5/day
- Capital cost
- —
- Stage
- Operational
- Owner or client
- ONAS
- Contractor
- —
- Operator
- ONAS
- Finance
- —
- Award or start year
- 1997
- Commissioned
- 1997
Record last checked 2026-09-20.
History
- 1997
Plant commissioned at Bizerte, together with the Menzel Bourguiba works
Sources
2 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- Ministere de l'Environnement of Tunisia, ONAS open data, Liste de stations d'epuration (sample years 2021 to 2023). environnement.gov.tn.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
Gives Bizerte a 1997 commissioning, 26,600 m3/day, 10,740 kg BOD5/day and 250,000 population equivalent, the largest of the four treatment works in Bizerte governorate, ahead of Menzel Bourguiba at 11,065 m3/day. Coordinates are the OpenStreetMap wastewater plant at Sidi Ahmed in Bizerte Sud, the only one mapped in the Bizerte area, given to two decimals because the feature is unnamed.