Al-Khobar Phase 2 MSF (Khobar II)

Thermal MSF + power, 223,000 m3/day in Saudi Arabia.

Operational

The record

Country
Saudi Arabia
Location
Al-Khobar
Coordinates
26.180, 50.210
Technology
Thermal MSF + power
Capacity
223,000 m3/day
Capital cost
—
Stage
Operational
Owner or client
Saline Water Conversion Corporation, now the Saudi Water Authority
Contractor
—
Operator
Saudi Water Authority
Finance
Saudi government capital budget
Award or start year
1982
Commissioned
1982

Record last checked 2026-09-20.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. O. A. Hamed and others (SWCC R&D Centre), SWCC MSF Desalination Plants: Current Status and Future Prospects, 6th Saudi Engineering Conference, KFUPM, December 2002, Table 1. faculty.kfupm.edu.sa.
  2. dates Al-Khobar II to 1982, extraction condensing turbine, power to water ratio 16.8 MW/MIGD, 16 flash stages.
  3. Saline Water Conversion Corporation, Annual Report 2022 (English), Production Plants Map, p. 73. swcc.gov.sa.
  4. gives Al-Khobar 2 at 223,000 m3/day and names it among the thermal plants being replaced by reverse osmosis.
  5. Coordinates from OpenStreetMap, Khobar Power and Desalination Plant, man_made=water_works. openstreetmap.org.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Saudi Water Authority production systems page, read 20 September 2026: it lists Khobar phases 2 and 3 and the two reverse osmosis systems as production systems, so the plant is in service. An earlier revision of this row moved it out of service partly on the ground that SHARAKAT's March 2026 statement omits it. That inference was wrong: SHARAKAT tabulates privately procured independent water projects, not the plants the authority owns and operates, so its silence says nothing about a state plant. The 630,000 m3/day reverse osmosis plant SWCC named as the replacement is held separately in this register, and the Asian Infrastructure Investment Bank approved US$300 million in March 2025 towards rebuilding the Jubail 1 and Khobar 2 MSF facilities, which is an upgrade rather than evidence of retirement.