TSE Seasonal Storage Lagoons, Phase 1
Treated effluent storage, Five lagoons totalling 22.5 million m3, plus an evaporation pond of 8.7 million m3 in Qatar.
Operational
The record
- Country
- Qatar
- Location
- Al Rakhiya
- Coordinates
- —
- Technology
- Treated effluent storage
- Capacity
- Five lagoons totalling 22.5 million m3, plus an evaporation pond of 8.7 million m3
- Capital cost
- —
- Stage
- Operational
- Owner or client
- Ashghal (Public Works Authority)
- Contractor
- Hyundai Engineering and Construction
- Operator
- Ashghal
- Finance
- —
- Award or start year
- 2025
- Commissioned
- 2025
Record last checked 2026-09-18.
History
- 2023-04
Ashghal reports Phase 1 about 75 per cent complete with two lagoons finished
- 2025-11
Ashghal announces completion of the main works of Phase 1
Sources
6 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- The Peninsula, Ashghal completes phase 1 of building five reservoirs for treated water in Qatar, 13 November 2025. thepeninsulaqatar.com.
- Main works of Phase 1 complete, five lagoons of 22.5 million m3 plus an 8.7 million m3 evaporation pond, fed from the Doha South Sewage Treatment Plant through the D-Line rising main, with 6 km of access road, 25 km of internal roads, 8 km of water pipelines and eight operation and maintenance buildings.
- Smart Water Magazine, Ashghal completes 75% of TSE Seasonal Storage Lagoons Phase 1, 14 April 2023. smartwatermagazine.com.
- Five reservoirs of 22.5 million m3 built from recycled excavated material, evaporation pond of 8.7 million m3, excavation to 10 m depth, contractor Hyundai Engineering and Construction.
- Gulf Times, Ashghal completes main works of TSE Seasonal Storage Lagoons project, Phase 1. gulf-times.com.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.