North Gaza Wastewater Treatment Plant

Wastewater treatment + aquifer recharge, 35,600 m3/day design capacity, with a planned expansion to 65,700 m3/day in Palestine.

Stalled

The record

Country
Palestine
Location
Beit Lahia
Coordinates
31.506, 34.510
Technology
Wastewater treatment + aquifer recharge
Capacity
35,600 m3/day design capacity, with a planned expansion to 65,700 m3/day
Capital cost
US$43 million
Stage
Stalled
Owner or client
Palestinian Water Authority
Contractor
—
Operator
Coastal Municipalities Water Utility
Finance
World Bank administered trust funds, with complementary recovery wells, irrigation networks and photovoltaic panels financed by the French Development Agency
Award or start year
2004
Commissioned
2018-03

Record last checked 2026-09-18.

History

Sources

7 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, Wastewater Management Sustainability Project appraisal document (P172578, May 2020). documents1.worldbank.org.
  2. The NGEST project financed the North Gaza Wastewater Management Facilities with a design capacity of about 35,600 m3/day to treat, infiltrate and recover sewage effluent, and the facilities entered full operation in March 2018; the document records the planned expansion to an average capacity of 65,700 m3/day needed after 2025, and the AFD financed complementary works.
  3. World Bank, project detail P074595. projects.worldbank.org.
  4. Project cost US$43.05 million; implementing agency the Palestinian Water Authority; closed 30 June 2018. World Bank, NGEST solar power feasibility study (Mar 2016). documents1.worldbank.org.
  5. Site table gives coordinates 31.5056 N and 34.5102 E, nearest town Jibaliya.
  6. ACAPS, Palestine: water crisis in the Gaza Strip briefing note (13 Dec 2023). acaps.org.
  7. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

As at 22 October 2023 all six wastewater treatment plants were not functioning for lack of fuel and electricity. No source opened establishes the plant's condition after October 2023.