Barka 1 IWPP

MSF/RO + power, 91,200 m3/day MSF contracted (20 MIGD) alongside 427 MW; two seawater RO expansions of 10 MIGD and 12.5 MIGD ran from 2014 and 2016 until their water purchase agreements expired on 29 September 2024 in Oman.

Operational

The record

Country
Oman
Location
Barka
Coordinates
23.708, 57.984
Technology
MSF/RO + power
Capacity
91,200 m3/day MSF contracted (20 MIGD) alongside 427 MW; two seawater RO expansions of 10 MIGD and 12.5 MIGD ran from 2014 and 2016 until their water purchase agreements expired on 29 September 2024
Capital cost
US$410 million
Stage
Operational
Owner or client
Barka Water and Power Company SAOG, formerly ACWA Power Barka SAOG; offtaker Nama Power and Water Procurement under a PWPA renewed on 30 May 2024
Contractor
Ansaldo and Hitachi Zosen (EPC of the base plant)
Operator
NOMAC Oman
Finance
Project finance, build own operate; ACWA Power 41.91 per cent with Multitech and a public float on the Muscat Stock Exchange from 12 January 2005
Award or start year
2003
Commissioned
2003-06

Record last checked 2026-09-18.

History

Sources

7 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Barka Water and Power Company, About. barkaone.com.
  2. Formerly ACWA Power Barka SAOG, incorporated 19 November 2000; base plant 427 MW gas fired with a 20 MIGD MSF facility, commercial operation from 11 June 2003; SWRO expansion phase I of 10 MIGD from 29 May 2014 and phase II of 12.5 MIGD from 26 February 2016, both water purchase agreements expired 29 September 2024 and operations ceased; IPO of 35 per cent and listing on the Muscat Stock Exchange 12 January 2005. ACWA Power, Barka 1 IWPP. acwapower.com.
  3. 427 MW and 91.2 thousand m3/day MSF, commercial operation Q1 2003, project cost US$410 million, EPC Ansaldo and Hitachi Zosen, O&M NOMAC Oman, ACWA Power 41.91 per cent, offtaker Oman Power and Water Procurement.
  4. Nama PWP, Water 7-Year Statement 2026-2032 (Issue 20). omanpwp.om.
  5. Purchase agreement renewed 30 May 2024 for nine years at about 91,000 m3/d, the MSF plant intended to remain on standby as a contingency reserve.
  6. Nama PWP, Contracts. omanpwp.om.
  7. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Barka I IWPP, Barka Water and Power Company, 427 MW and 91,200 m3/day. Location from OpenStreetMap, way named Barka 1 Water and Power Plant.