Hadba Khadra Wastewater Treatment Plant

Wastewater treatment, More than 110,000 m3/day in Libya.

Under construction

The record

Country
Libya
Location
Tripoli
Coordinates
32.830, 13.170
Technology
Wastewater treatment
Capacity
More than 110,000 m3/day
Capital cost
—
Stage
Under construction
Owner or client
Housing and Infrastructure Board, Government of National Unity
Contractor
Termomeccanica (Italy)
Operator
—
Finance
—
Award or start year
2025
Commissioned
—

Record last checked 2026-09-20.

History

No dated milestones recorded yet. They are added as each is confirmed against a public announcement.

Sources

9 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Libyan News Agency, Dbeibah announces the start of two wastewater treatment projects in Tripoli, 12 February 2025. lana.gov.ly.
  2. Prime Minister Abdulhamid Dbeibah announced the start of work on the Hadba Khadra wastewater treatment plant and on a discharge line for the plant's surplus flow and the Wadi al-Majnin.
  3. The plant will purify and treat more than 110,000 cubic metres of sewage a day.
  4. The second project runs 19 kilometres out to deep sea.
  5. The scheme had been stopped for more than 14 years and is being carried out with large specialised foreign firms after review by the oversight bodies.
  6. Al-Shahed, Work continues on the Hadba Khadra wastewater treatment plant in Tripoli, 13 February 2026. lywitness.com.
  7. Quoting the Government of National Unity's Hukumatuna platform, the plant is being built by the Italian company Termomeccanica under the supervision of the Housing and Infrastructure Board.
  8. Housing and Infrastructure Board, workshop announcement on wastewater treatment plants, the reality and the challenges, 23 June 2024. hib.ly.
  9. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Libya built more than 70 treatment plants of various capacities and technologies between the late 1960s and the early 1990s, and they did not meet their objectives. The Government of National Unity adopted the Board's 2024 to 2027 plan to rehabilitate and maintain existing plants and build new ones for many of the country's main cities. No cost figure and no completion date were published for the Hadba Khadra plant. Coordinates added on 20 September 2026, approximate. OpenStreetMap way 101078567, named محطة طرابلس لمعالجة مياه الصرف الصحي, the Tripoli wastewater treatment plant, covers 94 hectares between 32.8258 and 32.8373 north and 13.1588 and 13.1722 east. It is the only plant of that size in the city and fits the stated capacity of more than 110,000 m3/day. Reverse geocoding returns Abu Salim in Tripoli, about 3 km west of the Hadba Khadra neighbourhood node at 32.8329 13.2012, so the pin is given to two decimals.