Great Man-Made River Ghadames-Zuwara-Zawiya System

Fossil-aquifer conveyance, Design 250,000 m3/day; about 821 km of transmission and distribution lines; 106 production wells and 14 control wells in the Ghadames basin; three pumping stations and 26 feed points in Libya.

Stalled

The record

Country
Libya
Location
Ghadames to Zawiya
Coordinates
—
Technology
Fossil-aquifer conveyance
Capacity
Design 250,000 m3/day; about 821 km of transmission and distribution lines; 106 production wells and 14 control wells in the Ghadames basin; three pumping stations and 26 feed points
Capital cost
—
Stage
Stalled
Owner or client
Great Man-Made River Authority
Contractor
—
Operator
Great Man-Made River Authority
Finance
Libyan state
Award or start year
2001
Commissioned
—

Record last checked 2026-09-18.

History

Sources

3 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Great Man-Made River Authority, Ghadames - Zwara - Zawia system. gmra.com.ly.
  2. Designed to produce and distribute about 250,000 m3/day of drinking water from 106 production wells and 14 control wells in the Ghadames basin to population centres in western Libya through 26 feed points; about 821 km of transmission and distribution lines; three pumping stations, two reservoirs and a pressure break reservoir at Nalut with flow control, power transmission and control systems; partial operation from the end of 2009 with 10 production wells serving Nalut and its surroundings; about 8.5 million m3 produced to 31 December 2016. Great Man-Made River Authority, History and evolution of GMMR. gmra.com.ly.
  3. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Authority created by Law 11 of 1983 with funding under Law 10 of 1983; groundbreaking at Sarir on 28 August 1984; Brega pipe plant opened 28 August 1986; second phase launched 26 August 1989; Ajdabiya reservoir first received water 11 September 1989; Omar Mukhtar and Gardabiya reservoirs 4 September 1991; water reached the Sidi Assaiah reservoir in Tripoli 28 August 1996; fourth phase contract signed 10 October 2001; design capacity 4 million m3/day rising to 6.4 million m3/day when complete. Records the fourth phase implementation contract signed on 10 October 2001.