Kabd Wastewater Treatment Plant
Wastewater treatment + reuse, 180,000 m3/day, with a peak of 270,000 m3/day in Kuwait.
Operational
The record
- Country
- Kuwait
- Location
- Kabd
- Coordinates
- —
- Technology
- Wastewater treatment + reuse
- Capacity
- 180,000 m3/day, with a peak of 270,000 m3/day
- Capital cost
- —
- Stage
- Operational
- Owner or client
- Ministry of Public Works
- Contractor
- —
- Operator
- —
- Finance
- —
- Award or start year
- 2012
- Commissioned
- 2012
Record last checked 2026-09-18.
History
- 2012
Kabd plant commissioned with primary, secondary and tertiary treatment
- 2023
rated at 180,000 m3/day against a peak of 270,000 m3/day, with effluent reused for irrigation
Sources
2 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- Frontiers in Environmental Engineering, 2023. frontiersin.org.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
Sulaibiya 600,000 m3/day (2005), Kabd 180,000 m3/day with peak 270,000 (2012), Umm Al-Hayman 27,000 m3/day (2001); six plants named Riqqa, UAH, Sulaibiya, Kabd, Wafra and Khiran. Kabd is listed as commissioned in 2012 with primary, secondary activated sludge and tertiary granular media filtration, and treated effluent reused in irrigation.