West Irbid Wastewater Treatment Plant
Wastewater treatment, 12,000 m3/day in Jordan.
Planned
The record
- Country
- Jordan
- Location
- Irbid
- Coordinates
- 32.530, 35.800
- Technology
- Wastewater treatment
- Capacity
- 12,000 m3/day
- Capital cost
- US$30 million
- Stage
- Planned
- Owner or client
- Water Authority of Jordan
- Contractor
- —
- Operator
- —
- Finance
- EBRD sovereign loan US$19 million, UK HIPCA grant US$8 million, EU Neighbourhood Investment Platform grant EUR 2.75 million
- Award or start year
- 2024
- Commissioned
- —
Record last checked 2026-09-04.
History
- 2022-09
EBRD project summary document disclosed
- 2024-03
EBRD board approval
- 2024-12
US$30 million financing package signed with the Ministry of Planning and International Cooperation
Sources
3 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- EBRD, West Irbid Wastewater Treatment Plant, project summary document 54056 (board 6 March 2024, status signed). ebrd.com.
- EBRD, EBRD, UK and EU upgrade wastewater services in Jordan, 17 December 2024. ebrd.com.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.