Fifth Line to Jerusalem

Water transmission pipeline, 150 million m3/year, rising to about 450 million m3/year in Israel.

Operational

The record

Country
Israel
Location
Jerusalem
Coordinates
—
Technology
Water transmission pipeline
Capacity
150 million m3/year, rising to about 450 million m3/year
Capital cost
US$714 million
Stage
Operational
Owner or client
Mekorot (State of Israel)
Contractor
—
Operator
Mekorot
Finance
Mekorot
Award or start year
2022
Commissioned
2022-10

Record last checked 2026-09-18.

History

Sources

3 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Jerusalem Post, Mekorot completes fifth water transmission system for Jerusalem, 4 October 2022. jpost.com.
  2. about NIS 2.5 billion over six years of construction, a 13 km tunnel through the Jerusalem hills, 3 m diameter, initial transfer of about 150 million m3/year rising to about 450 million m3/year, carrying desalinated seawater from the coast and replacing the fourth system in service since 1994. Mekorot project page, The Fifth Line to Jerusalem. mekorot-int.com.
  3. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

water lifted from sea level to 900 m, 13 km section of 4 m diameter, pumping stations at both tunnel portals, first segment completed 2014 and the second in 2022, bored by TBM. Budget converted from NIS 2.5 billion at 3.5 ILS per US$, the October 2022 rate. Linear scheme, so coordinates are left blank.