Samarra Barrage

Barrage, 7,000 m3/s maximum discharge through 17 gated openings; 87 MW in 14 units in Iraq.

Operational

The record

Country
Iraq
Location
Samarra
Coordinates
34.197, 43.856
Technology
Barrage
Capacity
7,000 m3/s maximum discharge through 17 gated openings; 87 MW in 14 units
Capital cost
—
Stage
Operational
Owner or client
Ministry of Water Resources
Contractor
Zueblin (civil works); Ransomes and Rapier (hydro-mechanical works)
Operator
Ministry of Water Resources
Finance
Development Board (oil revenues)
Award or start year
1953
Commissioned
1956-04

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Mukhalad Abdullah, Nadhir Al-Ansari and Jan Laue, Water Resources Projects in Iraq: Barrages, Journal of Earth Sciences and Geotechnical Engineering 9(4) 2019, pp. 153-167. diva-portal.org.
  2. Samarra Barrage is the key control structure of the Tharthar project.
  3. It is 252 m long with 17 openings of 12 m by 12 m and a maximum discharge of 7,000 m3/s.
  4. A hydropower plant of 14 units with a maximum generation of 87 MW sits on the right bank and opened in 1971. Four irrigation openings of 2.5 m diameter feed the main canal of the Ishaqi scheme.
  5. Mukhalad Abdullah, Nadhir Al-Ansari and Jan Laue, Water Resources Projects in Iraq, Reservoirs in The Natural Depressions, Journal of Earth Sciences and Geotechnical Engineering 9(4) 2019, pp. 137-152. diva-portal.org.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The German company Zueblin carried out the structure and the British company Ransomes and Rapier the hydro-mechanical works; works started in 1953 and the project opened on 16 April 1956.