CountriesKnowledge Hubs
Data & Tools
Region AtlasMajor ProjectsPPP Pipeline & AwardsLive tendersWhere to find live tendersTariffs & cost benchmarksOrganization DirectoryMarketsIntelligenceStoriesCalendarAbout

Haditha Dam

Dam and hydroelectric scheme, 8.2 km3 reservoir (5.8 km3 live); 570 MW in six Kaplan units in Iraq.

Operational

The record

Country
Iraq
Location
Haditha
Coordinates
34.205, 42.367
Technology
Dam and hydroelectric scheme
Capacity
8.2 km3 reservoir (5.8 km3 live); 570 MW in six Kaplan units
Capital cost
—
Stage
Operational
Owner or client
Ministry of Water Resources
Contractor
Technopromexport
Operator
Ministry of Water Resources
Finance
Government of Iraq
Award or start year
1977
Commissioned
1988

Record last checked 2026-09-18.

History

Sources

2 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Mukhalad Abdullah, Nadhir Al-Ansari and Jan Laue, Water Resources Projects: Large Storage Dams, Journal of Earth Sciences and Geotechnical Engineering 9(4) 2019, pp. 109-135. diva-portal.org.
  2. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Haditha Dam is the only dam on the Euphrates inside Iraq and the second largest storage dam after Mosul; works started in 1977 and were completed in 1988; body 57 m tall and 8,950 m long in three parts with a mealy dolomite core and asphaltic diaphragm; lake capacity 8.2 billion m3 at the maximum operating level of 147 m a.s.l. with 5.8 billion m3 live; spillway of six 16 m openings passing 11,000 m3/s; hydroelectric plant of six Kaplan units totalling 570 MW. Detailed design and implementation of the hydroelectric plant were entrusted to Energoprojekt while Technopromexport carried out the other designs and general supervision with the Directorate General of Dams.