Basra Water Canal

Bulk conveyance + pumping, 238.5 km open canal at 21 m3/s design discharge, of which 15 m3/s for Basra, 5 m3/s for Nasiriyah and 1 m3/s for Souq al-Shuyukh; terminal storage basins of 750,000 m3 and 5 million m3 in Iraq.

Operational

The record

Country
Iraq
Location
Basra
Coordinates
30.565, 47.676
Technology
Bulk conveyance + pumping
Capacity
238.5 km open canal at 21 m3/s design discharge, of which 15 m3/s for Basra, 5 m3/s for Nasiriyah and 1 m3/s for Souq al-Shuyukh; terminal storage basins of 750,000 m3 and 5 million m3
Capital cost
—
Stage
Operational
Owner or client
Ministry of Water Resources
Contractor
—
Operator
Basra Water Directorate
Finance
Government of Iraq
Award or start year
1992
Commissioned
1997-12

Record last checked 2026-09-18.

History

Sources

5 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Mukhalad Abdullah, Nadhir Al-Ansari and Jan Laue, Water Resources Projects in Iraq, Irrigation, Journal of Earth Sciences and Geotechnical Engineering 9(4) 2019, pp. 249-274. diva-portal.org.
  2. Formerly the Wafaa al-Qaid canal, the Basra Water Canal carries Gharraf water to treatment plants in Nasiriyah, Souq al-Shuyukh and Basra.
  3. Work started in 1992, stopped at the beginning of 1993, resumed on 1 March 1996 and the canal opened on 23 December 1997 at a cost of 9.8 billion Iraqi dinars.
  4. It is 238.5 km long with a total discharge of 21 m3/s, crosses the Main Outfall Drain twice and passes beneath the Euphrates by a three-pipe siphon fed by pumping station PS1 of 24 units, with PS2 of 19 units at km 165.5; 200 km of the canal were lined with concrete and the rest with soil because of gypsum content, and the unlined sections have leaked and collapsed since 2003. 964media, Basra's main water pipeline passes two-thirds completion. en.964media.com.
  5. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Reports the Badaa canal collapsing in mid-June 2026 about ten days after repairs and again around 1 July 2026, cutting supplies by up to 50 per cent in affected districts, and a 37 km replacement transmission main under construction.