Baghdad Water Supply and Sewerage Improvement Project

Water supply and sewerage rehabilitation, 380 km of water distribution network targeted, of which 134 km rehabilitated by 2023 serving 222,700 people; the R2 water reservoir; six wastewater contracts covering the Ghazaliya sewer trunk, the Rasafa 2 pumping stations and the Habibiya, Ghazaliya, Khadra and Doura sewerage stations in Iraq.

Under construction

The record

Country
Iraq
Location
Baghdad
Coordinates
—
Technology
Water supply and sewerage rehabilitation
Capacity
380 km of water distribution network targeted, of which 134 km rehabilitated by 2023 serving 222,700 people; the R2 water reservoir; six wastewater contracts covering the Ghazaliya sewer trunk, the Rasafa 2 pumping stations and the Habibiya, Ghazaliya, Khadra and Doura sewerage stations
Capital cost
US$150 million
Stage
Under construction
Owner or client
Mayoralty of Baghdad
Contractor
—
Operator
Baghdad Water Authority and Baghdad Sewerage Authority
Finance
IBRD loan 87960, approved at US$210 million and reduced to US$150 million in 2023
Award or start year
2018
Commissioned
—

Record last checked 2026-09-18.

History

Sources

5 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, Baghdad Water Supply and Sewerage Improvement Project (P162094). projects.worldbank.org.
  2. Borrower the Republic of Iraq, implementing agency the Mayoralty of Baghdad, IBRD commitment US$210 million, board approval 31 January 2018, closing date 31 May 2026. World Bank, Restructuring Paper RES50166, May 2023. documents.worldbank.org.
  3. Loan signed 29 April 2018 and effective 16 July 2018; partial cancellation of US$60 million leaving a revised loan of US$150 million; 134 km of the targeted 380 km of network completed, benefiting an estimated 222,700 people.
  4. World Bank, Implementation Status and Results Report seq. 17, archived 6 March 2025. documents.worldbank.org.
  5. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Components are institutional strengthening at US$6.25 million, investment in drinking water supply and wastewater infrastructure at US$142.25 million and project management at US$1.5 million; commitments US$137.1 million and disbursements US$84.02 million at December 2024; R2 reservoir physical progress 89 per cent.