Karkheh Dam and Hydroelectric Plant

Dam and hydroelectric scheme, 5.3 km3 reservoir (3.9 km3 live); 400 MW in three Francis units; 3,306 million m3/year of regulated water and 340,000 ha of downstream irrigation in Iran.

Operational

Landmark 5.3 km3 held on the Karkheh, regulating 3.3 billion m3 a year for 340,000 hectares of Khuzestan.

The record

Country
Iran
Location
Andimeshk
Coordinates
32.491, 48.128
Technology
Dam and hydroelectric scheme
Capacity
5.3 km3 reservoir (3.9 km3 live); 400 MW in three Francis units; 3,306 million m3/year of regulated water and 340,000 ha of downstream irrigation
Capital cost
—
Stage
Operational
Owner or client
Iran Water and Power Resources Development Company
Contractor
Farab (electromechanical and hydromechanical EPC); Harbin turbines and Alstom generators
Operator
Iran Water and Power Resources Development Company
Finance
Government of Iran
Award or start year
1991
Commissioned
2002-09

Record last checked 2026-09-18.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Iran Water and Power Resources Development Company (IWPCO), project page. iwpco.ir.
  2. (in Persian).
  3. Earthfill dam with a clay core, 127 m high from foundation with a crest length of 3,030 m, 21 km north-west of Andimeshk in Khuzestan; total reservoir 5.3 billion m3 and useful capacity 3.9 billion m3 after sedimentation over 160 km2; installed capacity 400 MW in three vertical Francis units with average annual energy of 934 GWh; turbines by Harbin and generators by Alstom; 340,000 ha irrigated downstream and average annual regulated volume of 3,306.42 million m3; construction started December 1991, river diverted September 1995, first unit operational September 2002 and full operation by 2003. Farab, Karkheh hydro power plant. farab.com.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Client Iran Water and Power Resources Development Co.; 400 MW in three units of 133.3 MW at 155 rpm; average annual generation 934 GWh; EPC for electromechanical and hydromechanical equipment; status completed.