New Administrative Capital Nile Water Transmission

Bulk conveyance + pumping, 1.5 million m3/day design; 400,000 m3/day first treatment phase; about 67 km of route and 144 km of 2,200 mm mains in Egypt.

Under construction

The record

Country
Egypt
Location
Helwan to the New Administrative Capital
Coordinates
30.020, 31.750
Technology
Bulk conveyance + pumping
Capacity
1.5 million m3/day design; 400,000 m3/day first treatment phase; about 67 km of route and 144 km of 2,200 mm mains
Capital cost
—
Stage
Under construction
Owner or client
New Urban Communities Authority
Contractor
Arab Contractors, Orascom Construction, Concord for Engineering and Contracting and Ebna Elaam
Operator
—
Finance
Government
Award or start year
2019
Commissioned
—

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Al-Shorouk, Housing Ministry begins the project to transfer Nile water to the Administrative Capital at a capacity of 1.5 million cubic metres a day (Arabic), 24 November 2019. shorouknews.com.
  2. Capacity 1.5 million m3/day; investment about EGP 14 billion; intake from the Nile south of Helwan by the regional ring road; about 67 km of lines; contractors Arab Contractors, Ebna Elaam, Orascom Construction and Concord; client the New Urban Communities Authority; five underground strategic tanks of 100,000 m3 in total.
  3. ECPC Egypt, The New Administrative Capital Water Lines. ecpc.com.eg.
  4. Total capacity 1.5 million m3/day at about EGP 17.7 billion; three 2,200 mm delivery lines totalling 144 km; ECPC supplying 29,000 m of prestressed concrete pipe.
  5. Cairo 24, The New Administrative Capital company on the drinking water plant (Arabic), 11 August 2026. cairo24.com.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The capital is still served by two temporary lines from 10th of Ramadan and New Cairo totalling about 300,000 m3/day, with a 400,000 m3/day plant due in service the following year.