East Alexandria Sludge Treatment Unit

Sludge treatment and biogas recovery, Host plant 800,000 m3/day; four digesters of 16,000 m3 each in Egypt.

Operational

The record

Country
Egypt
Location
Alexandria
Coordinates
31.200, 29.950
Technology
Sludge treatment and biogas recovery
Capacity
Host plant 800,000 m3/day; four digesters of 16,000 m3 each
Capital cost
—
Stage
Operational
Owner or client
Construction Authority for Potable Water and Wastewater (CAPW)
Contractor
SUEZ and The Arab Contractors (consortium); design by AAW Consulting Engineers
Operator
—
Finance
AFD sovereign loan
Award or start year
2017
Commissioned
2023

Record last checked 2026-09-18.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. AFD, Sludge treatment at the East Alexandria wastewater treatment plant, project start 1 January 2017, end 31 December 2023. afd.fr.
  2. Sovereign loan to Egypt for the Construction Authority for Potable Water and Wastewater, an anaerobic digestion unit on 12 feddans at the existing 800,000 m3/day plant, with thickening reservoirs, digesters, gasometers and cogeneration, 110,000 to 160,000 kWh a day and 60 to 70 per cent electrical self-sufficiency.
  3. Engineering News-Record, Best Environmental: East Alexandria Wastewater Treatment Plant Extension Phase 2 (7 December 2023). enr.com.
  4. Completed project, US$115 million, owner CAPW, general contractor a consortium of SUEZ and The Arab Contractors, design by AAW Consulting Engineers, sludge reduced by 35 per cent.
  5. SUEZ water handbook, Sludge digestion unit, Alexandria East. suezwaterhandbook.com.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Four digesters of 16,000 m3 each. Cost figures diverge across sources and no single capital cost is entered: AFD's 2024 Alexandria factsheet gives EUR 50 million, ENR gives US$115 million.