Abu Rawash Wastewater Plant
Wastewater treatment (secondary upgrade), 1.6 million m3/day in Egypt.
Operational
The record
- Country
- Egypt
- Location
- Giza
- Coordinates
- 30.050, 31.100
- Technology
- Wastewater treatment (secondary upgrade)
- Capacity
- 1.6 million m3/day
- Capital cost
- US$430 million
- Stage
- Operational
- Owner or client
- Construction Authority for Potable Water and Wastewater (CAPW)
- Contractor
- Orascom Construction and FCC Aqualia joint venture (50:50)
- Operator
- Aqualia
- Finance
- AfDB loan US$150 million
- Award or start year
- 2017
- Commissioned
- 2022
Record last checked 2026-09-04.
History
- 2017-09
Orascom Construction and FCC Aqualia sign US$320 million EPC contract with three-year O&M
- 2022
Plant begins operations at 1.6 million m3/day
- 2023-03
AfDB reports the plant commissioned with US$150 million AfDB financing
- 2025-05
Egypt and AfDB sign deal for a fourth phase raising capacity to 2 million m3/day
- 2025-09
Aqualia O&M contract renewed to September 2029
Sources
6 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- Orascom Construction, Orascom Construction joint venture signs USD 320 million to build Abu Rawash wastewater treatment plant in Egypt, 13 September 2017. orascom.com.
- Orascom Construction project page. orascom.com.
- AfDB press release, Egypt: the Abu Rawash wastewater treatment plant, a model of sustainable development, 29 March 2023. afdb.africa-newsroom.com.
- Smart Water Magazine, Aqualia renews the management contract for the Abu Rawash wastewater treatment plant in Egypt, 22 September 2025. smartwatermagazine.com.
- Smart Water Magazine, Egypt and AfDB sign deal to expand Abu Rawash water treatment plant, 14 May 2025. smartwatermagazine.com.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.