6th of October Western Sewage Plant Expansion
Wastewater treatment, 150,000 m3/day (expansion) in Egypt.
The record
- Country
- Egypt
- Location
- 6th of October
- Coordinates
- 29.940, 30.920
- Technology
- Wastewater treatment
- Capacity
- 150,000 m3/day (expansion)
- Capital cost
- —
- Stage
- Operational
- Owner or client
- Construction Authority for Potable Water and Wastewater (CAPW)
- Contractor
- —
- Operator
- —
- Finance
- —
- Award or start year
- 2020
- Commissioned
- —
Record last checked 2026-09-18.
History
- 2020
Expansion of the Western sewage treatment plant begins, 150,000 m3/day, EGP 950 million
- 2022
Expansion completed
Sources
2 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- Misr Consult, 6th October City Western Sewage new treatment plant expansion with a capacity 150,000 m3/day (design consultant, 2020 to 2022, EGP 950 million). misrconsult.com.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
Client the Construction Authority for Potable Water and Wastewater, owner the 6th of October City Authority and the New Urban Communities Authority, scope design, tender documents and construction supervision. The 2020 to 2022 window is the consultant's own engagement and the page states no commissioning date, so no commissioning year is carried in this record. This is a consultant's portfolio page and no Egyptian government source confirming operation could be reached. Two other schemes in the same city are separate projects and are not covered by this record: a 150,000 m3/day design-build-finance-operate wastewater plant for which NUCA and the PPP Central Unit invited qualifications in February 2024, and a 400,000 m3/day drinking water plant awarded to Hassan Allam Construction in June 2019.