Tubli Water Pollution Control Centre
Wastewater treatment + reuse, 400,000 m3/day after phase 4 expansion (from 200,000 m3/day) in Bahrain.
Operational
The record
- Country
- Bahrain
- Location
- Tubli
- Coordinates
- 26.190, 50.550
- Technology
- Wastewater treatment + reuse
- Capacity
- 400,000 m3/day after phase 4 expansion (from 200,000 m3/day)
- Capital cost
- —
- Stage
- Operational
- Owner or client
- Ministry of Works, Municipalities Affairs and Urban Planning, Bahrain
- Contractor
- WTE Wassertechnik, Azmeel Contracting and Tecton Engineering consortium (Cebarco civil subcontractor)
- Operator
- —
- Finance
- Grants from Saudi Arabia and Kuwait under the Gulf Development Programme
- Award or start year
- 2018
- Commissioned
- —
Record last checked 2026-09-04.
History
- 2018-09
Phase 4 expansion contract awarded to the WTE, Azmeel and Tecton consortium
- 2024-08
Expansion reported around 80 per cent complete
Sources
5 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- MEED, Bahrain awards Tubli wastewater plant expansion deal, 9 September 2018. meed.com.
- Gulf Construction, Tubli, Sitra STPs make progress in Bahrain, 1 August 2024. gulfconstructiononline.com.
- WTE Wassertechnik, Wastewater treatment and sewage sludge incineration, Tubli, Bahrain. wte.de.
- Ministry of Works, Tubli Sewage Treatment Plant Expansion Project Phase Four. works.gov.bh.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.